Deployment of Optical Fiber Cable at Nigerian Defense Academy, Kaduna
The scope of this project was to install fiber as well as:
- Trenching along the predetermined route
- Ducting along the route
- Backfilling the trenches
- Passing of the fiber cable
- Splicing of the cables and terminating
- Conduct loss tests to minimize loss as well as OTDR Charts